Projects
Eight-storey hotel with basement, Madinah
Hotel · full structural supervision · basement + ground + 7 repeated floors · 44 site photographs across 14 construction stages
Overview
Full supervision of the concrete structure, from excavation to the seventh repeated floor. The project is documented by 44 site photographs across 14 named construction stages, from the raft and the basement columns and necks up through the repeated floors, and that sequence is what establishes the floor count. The photographic record ends at the seventh floor.
- Project type
- Hotel
- Service
- Design and supervision
- Reference
- S-02
Design renderings
Construction stages